Let Bimla take x days to complete the work alone.
Aditi takes 60% more time than Bimla:
Aditi takes =x+0.6x=1.6x days
If someone completes work in x days, their work rate per day =x1
Bimla's work rate =x1
Aditi's work rate =1.6x1
When working together, the combined work rate equals the sum of individual rates.
They complete the work together in 16 days, so combined work rate =161
x1+1.6x1=161
Simplifying the left side:
x1(1+1.61)=161
Since 1.6=58, we have 1.61=85
x1(1+85)=161
x1(813)=161
8x13=161
Cross multiplying:
13×16=8x
208=8x
x=26
Therefore, Bimla takes 26 days to complete the work alone.